October was about putting the stack to work. Headlines ranged from the Cartesi Foundation backing Knoss, a derivatives exchange built on Cartesi Rollups, to a governance proposal to permanently renounce the CTSI MinterRole, now open for consultation as Mine Reserve staking rewards are set to end around July 2027. Across the tech stack, releases deepened fraud-proof integration and made the emergency-exit path more complete, from the node to the tools developers use every day.

Let’s dive into the full roundup of what happened across the Cartesi ecosystem this past month.

Tech

This past month moved the whole stack forward, from deposit refunds in the Rollups Node and emergency-withdrawal support in the tooling, to a new Cartesi Machine release, a sturdier Sequencer alpha, and tighter dispute timing in the fraud-proof system.

Cartesi Rollups Node v2.0.0-alpha.13 targets Rollups Contracts 3.0.0-alpha.10 and PRT 3.0.0-alpha.5, along with Cartesi Machine Emulator v0.21.0. Deposits that weren’t finalized before an application was foreclosed can now be refunded straight from the CLI, adding another layer to the emergency-exit path.

As always, our developer advocates are eager to help anyone unpack such technical details:

PRT support took a real step forward as well. The node now tracks v3 tournaments, exposes a richer dispute state, supports tournament-result staging, and recovers eligible root bonds.

The JSON-RPC API also got a lot richer: JSON-RPC 2.0 batch requests, inclusive index ranges, filtering by transaction hash, terminal states with proof leaves, node info, and output counts. Under the hood, service supervision, readiness checks, transaction submission, and restart safety all got tighter. This is a pre-release for core devs and testers with breaking changes included, so check the release notes before upgrading.

New Cartesi CLI alpha releases brought emergency withdrawal workflows directly into the local developer environment. Starting with 2.0.0-alpha.38, developers could foreclose an application, refund unfinalized deposits, and withdraw finalized balances using ‘cartesi foreclose’, ‘cartesi refund’, and ‘cartesi withdraw’. The CLI also added NVRAM support in cartesi.toml, exposed application health and terminal states, and moved the default SDK to 0.12.0-alpha.44, carrying Rollups Node 2.0.0-alpha.13 and Cartesi Machine 0.21.

Alpha.39 further simplified emergency withdrawals by deriving their configuration directly from the machine’s accounts drive, so there’s no separate config to keep in sync. Alongside the CLI, Rollups Explorer v2.0.0-alpha.4 added foreclosure, withdrawal, and PRT support, while new rollups-ts releases brought updated PRT read models, bond events, terminal application states, and Rollups Node API support to TypeScript and React developers.

Cartesi Machine Emulator v0.22.0 added new building blocks for the fraud-proof system, starting with direct collection of the machine and microarchitecture hash bundles used to build computation hashes. The CLI could now explicitly begin, end, and resume epochs while advancing application state, so long-running verification work can pick up where it left off instead of starting over.

The release also exposed more of the machine state that verifiers need and hardened proofs, memory translation, interrupts, VirtIO, and JSON-RPC handling across the board. It included breaking changes, including renamed CLI options and a JSON-RPC protocol bump to 0.8.0, so check the changelog before upgrading. Machine Solidity Step v0.16.0 shipped the same day to keep the onchain implementation of the machine in sync with the new emulator. Because the fixes also run inside the microarchitecture, machine root hashes differ from v0.21.0.

Meanwhile, the Cartesi Sequencer reached v0.1.0-alpha.10, a broad update focused on making the early sequencer stack easier to integrate and operate. Public APIs now serve fee estimates, user nonces, and signing-domain information for wallets and frontends, while versioned application history, historical replay, and improved checkpoints make recovery after interruptions more reliable.

The release also reworked the watchdog that independently verifies sequencer state, adding durable checkpoints and divergence detection, and tightened startup, shutdown, snapshot handling, and runtime fault recovery across the stack. It moved to Rollups Contracts 3.0.0-alpha.10 and Cartesi Machine v0.21.0, and watchdog operators should review the state-directory and checkpoint compatibility requirements before upgrading.

On the fraud-proof side, Dave 3.0.0-alpha.6 introduced a new generation of the Permissionless Refereed Tournament contracts, focused on timing and liveness during disputes. Tournament clocks now refill, up to a cap, when a participant wins a nested dispute, so repeated Sybil challenges can't drain an honest participant's clock. The overall allowance also holds an extra reserve for response latency, a fix for finding F-01 from the latest PRT verification review.

The release also aligned the fraud-proof system with Cartesi Machine v0.22 and Machine Solidity Step v0.16, added richer tournament events and operator safeguards, and brought stronger startup and compatibility checks to the Sling node. It’s a new deployment generation, so PRT contract addresses and machine state hashes all move and nodes need a fresh data directory. The node refuses v0.21 machines and data directories. Nothing is deployed on mainnet yet, so there’s no migration to worry about.

Sling, Cartesi’s alternative PRT validator implementation, also received a major hardening pass in this release. The work improves validator diversity and operational reliability as the fraud-proof system moves toward broader testing.

All this and more will be logged in our new Engineering Reports. Check out the recently published Q3 edition on our blog, where we break down the quarter's progress across PRs, commits, and releases:

For a bird’s-eye view, the Technical Plan page on our website tracks current architecture priorities and is updated regularly as work progresses. It’s the go-to place to see where the technical teams are focusing their time and effort right now.

And if you haven’t explored the new website yet, now’s the time. Everything is clearer and better organized, so finding what you need is easier than ever.

Ecosystem

The month’s highlight is the new governance announcement: a two-part communication that interests stakers and holders alike, as well as the wider community.

As intended, the Mine Reserve-funded staking rewards are expected to end around July 2027, depending on block production. This will not affect existing CTSI balances, staking, unstaking, withdrawals, or governance voting, and no action is required from stakers solely because rewards are ending.

Separately, the Cartesi Foundation proposes permanently renouncing the MinterRole on the existing CTSI token contract. If approved and executed, this irreversible change would eliminate the ability to mint additional CTSI under the contract, fixing its total supply at 1 billion CTSI. Any future CTSI-funded initiatives would rely on the existing supply.

The proposal is open for a 21-day community consultation, followed by a governance vote for or against permanent renunciation. And this is where everyone’s input is welcome on the forum, so make sure you log in and drop your comments:

On the business side, October opened with another big announcement on day one, which might already be familiar to many of us: the Cartesi Foundation is backing Knoss, a derivatives exchange being built on Cartesi Rollups. Worth revisiting the details, ICYMI:

Behind Knoss are Felipe Argento, Danilo Tuler, Pedro Argento, Eduardo Barthel, and Brandon Isaacson, contributors from the Cartesi ecosystem who have taken on this mission as an independent venture, building a product on the stack themselves that makes its value click.

The Foundation funded Knoss's early development through a grant and holds a contractual right to 25% of its net revenues after essential operating and growth costs. All revenue received will go back into developing Cartesi.

Over the years, experience has shown that technical advantage alone doesn't drive adoption, so the next stage for Cartesi is putting the tech to work in a real commercial product, where the requirements can shape the infrastructure directly.

To read more about this new direction and what it means for Cartesi and Knoss, check out this strategy explainer, and while you're at it, give Knoss a follow on X so you don't miss any updates.

Community

On the community front, October brought Token2049, where a few fortunate contributors got to be on the ground and take the pulse of the industry.

Back on the feed, Linux made a few well-deserved appearances in between posts, because what else would?

We also caught a few trends along the way, one of which was the perfect excuse to share this letter with everyone:

Plus, more GIFs for all the animation enjoyers out there.

And in case it ever needed repeating, the mission hasn’t changed. We hope it’s as clear to the community as it is to us:

Media

Over on social media, our TikTok kept growing steadily this month, with content going up regularly. If you haven’t yet, hit follow and get your TikToker frens to do the same, so we can reach even more people curious about Cartesi. Not on TikTok? The Cartesi YouTube channel has you covered, with videos and shorts dropping there all the time.

Our CoinMarketCap community keeps growing too, passing 90,700 followers this month. CoinMarketCap also continued publishing AI-powered articles about Cartesi and our latest updates. Follow our profile to join the community and learn more about what it means to build with Linux onchain, backed by Ethereum’s security.

One last thing: these updates also go out in the Cartesians’ monthly newsletter, and yes, there’s another merch pack waiting. Follow us on TikTok, slide into our DMs, and it could be yours. If you’re not subscribed yet, sign up here and catch the next one first.

That’s a Wrap

This was October: solid progress on the tech side, with a new way to follow it all through the Quarterly Engineering Reports, and fresh energy across the ecosystem as Knoss builds on the stack. On the governance side, the consultation on permanently renouncing the CTSI MinterRole is in full swing ahead of a vote, alongside the reminder that Mine Reserve staking rewards are set to wind down around July 2027. Throw in a few events and social trends along the way, and it was a full month.

We’re rolling into November ready to keep shipping and to keep expanding what’s possible on this compute layer for production-ready DeFi products.

More is on the way, so stay tuned. Until then, join the conversation on Discord, X, or Telegram, and don’t forget to make your voice heard on the governance forum.

More must-see content pieces

Backing Knoss, an options exchange on Cartesi and Ethereum | Co-founder Erick de Moura
Options and complex derivatives are coming onchain | Knoss, built on Cartesi

Builders of Cartesi, now building on it | Co-founder Erick de Moura

Options need a risk engine, and a risk engine needs a computer | Contributor Gabriel Coutinho

Putting the Cartesi Machine to work in DeFi | Contributor Eduardo Barthel

The infrastructure is finally ready | Contributor Pedro Argento

A derivatives exchange, straight off the wishlist | Contributor Shaheen Ahmed

Building options the right way, on the Cartesi Machine | Contributor Guilherme Dantas

Why options are still almost absent onchain | Community Member cartesiian

How Cartesi brings options onchain | Community Member cartesiian

Linux expands what developers can build onchain | Community Member Akshay

Cartesi's Q3 2026 engineering milestones | Inside Predict

Same tech, fresh new look | New Cartesi Website

Cartesi Releases | Cartesi GitHub

Cartesi Builder Resources | Mugen Builders GitHub

What Is Cartesi (CTSI) | CoinMarketCap AI-powered feature

Latest Cartesi (CTSI) News Update | CoinMarketCap AI-powered feature

Mine Reserve rewards end, now on the calendar | CoinMarketCal

MinterRole consultation, now on the calendar | CoinMarketCal

Mine Reserve completion and CTSI MinterRole renunciation | Cartesi Governance Forum